ზღვის უბნის დასახლება მდებარეობს თემქასთან ახლოს, ეს უბანი ახალი გაშენებულია და წარმოადგენს ერთერთ მოთხოვნად ადგილს თბილისის შემოგარენში . ჩვენს პლატფორმაზე შეგიძლიათ მოძებნოთ სახლები და მიწის ნაკვეთები ზღვის უბანში
Urgent sale in the new building of NEXT WHITE, a studio-type apartment, where the layout of the apartment allows to isolate the bed from the living room space
For immediate sale, in the first strip of the sea (150 meters from the sea), near the aquapark (300 meters from the aquapark) 1-room renovated apartment
For rent in the center of Batumi, on Era Square, a 3-story black frame building (first floor: 1144 sq. meters; second floor: 1106 sq. meters; third floor: 1100 sq. meters + open attic)
Villa for immediate sale in Batumi, Akhal Boulevard, 300 meters from the sea. The villa has 4 floors, of which the 4th floor is a terrace. The total area of the villa is 188 square meters. Behind the villa there is an additional isolated yard of 25 sq.m. Each villa has its own parking space. A common pool will also function in the territory of the villa. The villa is being built with first-class construction materials, the exterior facade will be wrapped with aluminum composite panels, and the doors and windows will be installed with aluminum material. The house is built with aerated concrete material. The price of 1 sq m is $1,500, internal installments are also possible in case of pre-payment of 50%. Planning: 1st floor - parking, living room, kitchen 2nd floor - 2 bedrooms, bathroom 3rd floor - 2 bedrooms, bathroom 4th floor - recreation area, open terrace, greenery Project construction will be completed in September 2024
For sale 300 meters from the sea - in a building under construction - 35, 49, 52, 60 square meter apartments are built with first quality construction materials, the exterior facade will be wrapped with aluminum composite panels, the door and window will be installed with aluminum material. Apartments are built with aerated concrete material. The price of 1 sq m starts from 1200 $, internal installments are also possible in case of advance payment of 30%. 10% discount applies in case of single payment. The construction completion date is December 2024